Manna Energy
3 Mega Watt - Batu Balai, Bengkulu3 Mega Watt Pembangkit Listrik Tenaga Mini Hidro project in Bengkulu, Sumatra Selatan, executed between 2017 and 2019 for PT Manna Energy.
The objective is supporting the government to diversify energy and reduce pollution. Challenges involve sourcing feasible water for PLN electricity and ensuring consistent supply throughout contracts. Factors include rainfall analysis, hydrology research, and purchasing water from PLN-contracted firms based on optimal flow and waterfall height. Infrastructure ease in Java contrasts with overproduction, while regions like Sumatra and Sulawesi boast higher water flow, though security and infrastructure remain concerns.
Sulawesi has 10,200 MW of water energy potential. Mini hydro was only massively developed recently due to access
3 Mega Watt Pembangkit Listrik Tenaga Mini Hidro project in Bengkulu, Sumatra Selatan, executed between 2017 and 2019 for PT Manna Energy.
3.5 Mega Watt Pembangkit Listrik Tenaga Mini Hidro project in Dominga, Sulawesi Utara, completed between 2022 and 2024 for PT Sulawesi Hidro Energy.