Style Switcher
Color Skins
  • Jl. Margasatwa No.111 Pondok Labu
    Jakarta Selatan 12450 Indonesia

  • Phone: (+62) 21 750 33 55
    Fax: (+62) 21 750 46 77

Kode KBLI

-

Investment Value

IDR 2.600 Billion

Year

-

Internal Rate of Return

14 %

Net Present Value

-

Longitude

-

Payback Period

-

Latitude

-

Waste to Energy (PSEL) - Semarang

Semarang is advancing its waste management with the construction of an eco-friendly Waste-to-Energy Plant (PLTSa), as mandated by Presidential Regulations No. 35 of 2018 and No. 109 of 2020. The project aims to reduce waste by at least 80%, replace the overburdened landfill with modern facilities, and treat liquid waste (leachate). Using waste-to-energy technology, it will convert waste into electricity while meeting emission standards, ensuring more sustainable waste management for the city.

The investment scheme for the Public-Private Partnership (PPP) includes the design, construction, operation, and maintenance of Waste-to-Energy (PSEL) facilities and supporting infrastructure. It also covers site preparation, land investigation, transmission line installation, and Corporate Social Responsibility (CSR) management. The PPP will last for 20 years, with a maximum construction period of 3 years, focusing on sustainable waste management and energy production.

Fill This Form to Download Document!