Kode KBLI

-

Investment Value

Rp 465.220 Billon

Year

-

Internal Rate of Return

11,05 %

Net Present Value

Rp. 104 Billion

Longitude

-

Payback Period

7 Years

Latitude

-

Solar Power Plant - East Kalimantan

The Indonesian government is relocating the capital to Penajam Paser Utara in East Kalimantan to foster equitable growth and attract investment. This initiative emphasizes infrastructure planning for a sustainable city integrated with local forests and focuses on economic transformation through industrial downstreaming.

Under Presidential Regulation No. 64 of 2022, the new capital will be powered entirely by new and renewable energy, requiring the development of large-scale solar farms, wind farms, and hydropower facilities. Specifically, the 2021-2030 Electricity Generation General Plan (RUPTL) includes 50 MW of solar power (PLTS) to commence operations in 2025, along with 70 MW of wind power (PLTB) and 1,000 MW of hydropower (PLTA). These efforts aim to achieve renewable energy targets of 12.39% by 2025 and 28.72% by 2050 in East Kalimantan, supporting Indonesia's broader renewable energy goals.

The current condition regarding electricity demand and supply for IKN (the new capital city) highlights that electricity demand is projected to reach 95.5 MW by 2024. To meet this growing demand, there is a mandatory local component requirement (TKDN) of 40.68% for energy projects, with utility-scale solar power plants (PLTS) currently achieving compliance levels between 15% and 47%. This presents an opportunity for enhancing local production capabilities and fostering domestic industry participation in renewable energy initiatives.

To ensure sustainability, electricity for IKN must be sourced from 100% renewable energy, following a single seller business model with its own tariff policy as stipulated in Presidential Regulation No. 63 of 2022. Additionally, the RUPTL 2021-2030 establishes a quota of 50 MW for the Central and East Kalimantan region, underscoring the government's commitment to developing renewable energy infrastructure to support the energy needs of the new capital.