Solar Power Plant - Banten
According to the 2021-2030 Electricity Supply Business Plan (RUPTL), Banten Province has a 435 MW solar power plant (PLTS) development quota by 2030. The Banten PLTS project, with a planned capacity of 50 MWp, is expected to utilize 100 MW of the province’s solar power quota by 2025 through an Independent Power Producer (IPP) scheme. Connected to the Java-Madura-Bali power grid, it will ensure reliable electricity supply.
The project aims to increase renewable energy's share to 23% by 2025, generating 78 GWh of electricity annually and reducing carbon emissions by 46.7 kilotons of CO2 per year.
The chosen site is in Cihara District, Lebak Regency, located in a production forest area with daily solar irradiance of 4.76-4.89 kWh/m² and close proximity to 150 kV infrastructure (5 km away). The area has favorable topography, with low risks of flooding and landslides.