Investment Value

IDR340 Billion

Year

2023

Internal Rate of Return

16,78 %

Net Present Value

IDR40,8 Billion

Longitude

-

Payback Period

4-5 Years

Latitude

-

Mini Hydropower Plants (PLTMH) - Pekalongan 9 MW

Mini Hydropower Plants (PLTMH) are considered a long-term prospective investment. As is known, one key aspect in calculating a country's economic growth and welfare is its electricity growth rate. According to national electricity data, the installed electricity capacity in Pekalongan Regency in 2022 was 823,723 kW. With this installed capacity, only 93% of the area has access to electricity, meaning that 7% of the electricity demand is still unmet. This ratio is still low compared to several other regencies.

In Pekalongan Regency, three Mini Hydropower Plants (PLTMH) are operating, with further potential in the Paingan Watershed (4,237-4,790 kW) and three untapped sites along the Sengkarang River. The Welo River offers 23 potential sites with 4,097-9,331 kW of energy, across Petungkriyono, Talun, and Doro Districts.