Style Switcher
Color Skins
  • Jl. Margasatwa No.111 Pondok Labu
    Jakarta Selatan 12450 Indonesia

  • Phone: (+62) 21 750 33 55
    Fax: (+62) 21 750 46 77

Investment Opportunities

Green Energy
Asia Has Promising Potential

Southeast Asia has promising potential in the development of green energy projects such as Hydropower, Solar Power, and Biomass.

Energy Efficiency
Management For More Efficient

Through the green project, energy management can become more efficient as we work together with partners who can provide

Waste & Water Management
Most Prominent Issue to Tackle

Wastewater and water treatment has been one of the most prominent issue to tackle in Southeast asia, especially Indonesia.

Available Projects

Green Energy

Investment Value

IDR403 Billon

Payback Period

6.66 Years

IRR

13,02%

NPV

IDR152 Billion

Solar Power Plant - Banten

According to the 2021-2030 Electricity Supply Business Plan (RUPTL), Banten Province has a 435 MW solar power plant (PLTS) development quota by 2030. The Banten PLTS project, with a planned capacity of 50 MWp, is expected to utilize 100 MW of the province’s solar power quota by 2025 through an Independent Power Producer (IPP) scheme. Connected to the Java-Madura-Bali power grid, it will ensure reliable electricity supply. Read more....

Green Energy

Investment Value

IDR340 Billion

Payback Period

4-5 Years

IRR

16,78%

NPV

IDR380.8 Billion

Mini Hydropower Plants (PLTMH) - Pekalongan 9 MW

Mini Hydropower Plants (PLTMH) are considered a long-term prospective investment. As is known, one key aspect in calculating a country's economic growth and welfare is its electricity growth rate. According to national electricity data, the installed electricity capacity in Pekalongan Regency in 2022 was 823,723 kW. With this installed capacity, only 93% of the area has access to electricity, meaning that 7% of the electricity demand is still unmet. This ratio is still low compared to several other regencies. Read more....

Green Energy

Investment Value

IDR2.6 Trillion

Payback Period

-

IRR

14%

NPV

-

Waste to Energy (PSEL) - Semarang

Semarang is advancing its waste management with the construction of an eco-friendly Waste-to-Energy Plant (PLTSa), as mandated by Presidential Regulations No. 35 of 2018 and No. 109 of 2020. The project aims to reduce waste by at least 80%, replace the overburdened landfill with modern facilities, and treat liquid waste (leachate). Using waste-to-energy technology, it will convert waste into electricity while meeting emission standards, ensuring more sustainable waste management for the city. Read more....

Green Energy

Investment Value

IDR6.9 Billion

Payback Period

2 Years 3 Months

IRR

13,36%

NPV

IDR18.2 Billion

Development of Waste Disposal Site - Grobogan Regency

Urban waste management is a critical issue that requires sustainable solutions, especially with increasing waste volumes driven by population growth and rising consumption. To address this, we focus on three key areas: effective waste collection and cleaning, efficient transportation from the source to landfills, and the reduction, processing, and recycling of waste. This approach ensures cleaner cities and promotes long-term sustainability, positioning our project as a vital step toward a greener, more efficient urban future. Read more....

Green Energy

Investment Value

IDR44.2 Billion

Payback Period

3 Years 8 Months

IRR

22,82%

NPV

IDR47.9 Billion

Mini Hydropower Plants (PLTMH) - Banyumas Logawa 3

Indonesia has abundant primary energy resources, including renewable sources like wind, solar, water, geothermal, and biomass, but currently, renewables contribute only about 11% of the electricity supply. With declining oil reserves, there is an urgent need to enhance alternative energy use to reduce reliance on fossil fuels and mitigate environmental degradation, as highlighted by the Kyoto Protocol. The government aims for renewable energy to make up 20% of the energy mix by 2025, promoting the development of hydroelectric power plants (PLTA) to replace expensive diesel plants. Read more....

Green Energy

Investment Value

IDR32.5 Billion

Payback Period

4 Years

IRR

25,82%

NPV

IDR24.9 Billion

Mini Hydropower Plants (PLTMH) - Banyumas Logawa 2

Indonesia has abundant primary energy resources, including renewable sources like wind, solar, water, geothermal, and biomass, but currently, renewables contribute only about 11% of the electricity supply. With declining oil reserves, there is an urgent need to enhance alternative energy use to reduce reliance on fossil fuels and mitigate environmental degradation, as highlighted by the Kyoto Protocol. The government aims for renewable energy to make up 20% of the energy mix by 2025, promoting the development of hydroelectric power plants (PLTA) to replace expensive diesel plants. Read more....

Green Energy

Investment Value

IDR34.9 Billon

Payback Period

5 Years 2 Months

IRR

25,82%

NPV

IDR29.4 Billion

Mini Hydropower Plants (PLTMH) - Banyumas Banjaran

Indonesia has abundant primary energy resources, including renewable sources like wind, solar, water, geothermal, and biomass, but currently, renewables contribute only about 11% of the electricity supply. With declining oil reserves, there is an urgent need to enhance alternative energy use to reduce reliance on fossil fuels and mitigate environmental degradation, as highlighted by the Kyoto Protocol. The government aims for renewable energy to make up 20% of the energy mix by 2025, promoting the development of hydroelectric power plants (PLTA) to replace expensive diesel plants. Read more....

Green Energy

Investment Value

IDR465 Billon

Payback Period

7.1 Years

IRR

11,05%

NPV

IDR104 Billion

Solar Power Plant - East Kalimantan

The Indonesian government is relocating the capital to Penajam Paser Utara in East Kalimantan to foster equitable growth and attract investment. This initiative emphasizes infrastructure planning for a sustainable city integrated with local forests and focuses on economic transformation through industrial downstreaming. Read more....